Solutions From Concept To Completion
Structural Engineering
Site Solutions From Concept To Completion
Civil Engineering
Solutions Where Land Meets Water
Marine + Coastal
Solutions From Procurement To Completion
Construction Engineering
Structural + Mechanical Specialists
Entertainment Engineering
Consultation, Design + Inspection
Facade + Building Envelope
Soil + Foundation
Geotechnical Engineering
Investigation + Litigation Support
Forensic Engineering
Arts + Entertainment
Live Performances
Museums + Art Displays
Pop-Ups
Signage
Studios + Sound Stages
TV + Film Production
Theaters
Theme Parks + Playplaces
discover
Education
Colleges + Universities
Private + Specialty Schools
Public K-12
discover
Energy
Solar Energy
Transmission Infrastructure
Wind Energy
Oil + Gas
discover
Government
Municipal
State
Federal
discover
Healthcare
Senior Care
Hospitals
Outpatient Facilities
discover
Industrial
Heavy Industrial
Warehouse + Distribution Centers
Industrial Ports + Terminals
discover
Ports + Coastal
Berths, Piers + Wharves
Bulkheads
Esplanades
Ferry Landings, Ship Terminals
Floating Structures
Ports + Terminals
Marinas + Breakwaters
Transfer Stations
discover
Public Infrastructure
Bikeways + Trails
Garage + Parking Facilities
Parks + Public Spaces
Recreational Spaces
Streetscapes
Utility Infrastructure
Water + Wastewater
discover
Real Estate Development
Commercial
Community Facilities
Mixed-Use
Multifamily Residential
discover
Transportation
Airports
Bridges
Ports + Terminals
Rail Transportation
Roads + Highways
Ropeway + Linear Infrastructure
discover
Floating Harbor Wetland
Multimodal Processing Plant
416 + 420 Kent Dynamic Highrise
Wittpenn Bridge
Tiffany Crane
LaGuardia Airport Terminal B
NYC Ferry
Orlando Airport LED Displays
A leading full-service engineering firm renowned for our trusted, high quality, and innovative approach to solving complex challenges.

The Smyth – Light Gage Steel Building

The Smyth is one of North America’s tallest pre-fabricated metal load-bearing wall panel projects. This L-shaped mixed-use, development features 12 stories of light gage steel framing, supported by a concrete transfer slab atop the 5-story concrete podium. In addition to designing the structural framework of the light gage steel levels, McLaren provided structural plans for the highrise’s 19,330 square feet of retail space and 5-level parking garage.

Constructed at 885 Washington Blvd in Stamford, CT, The Smyth offers a modern industrial chic aesthetic with walkable access to several shopping, dining and nightlife options from its center-of-town location. Totaling 17-stories of luxury 400+ residential units — the penthouse levels were engineered with 14 inch and 16 inch composite joists to span up to 35 feet while still limiting floor deflections and vibrations.

This luxury multifamily apartment building’s amenities includes co-working spaces with private offices and conference capabilities, intended to offer residents a better work from home experience. McLaren also engineered custom steel-framed glass canopies for the top floor of the building that provides a glass-clad amenity space that includes a fitness room, clubroom, and an exterior rooftop pool.

The McLaren Difference: Applied Ingenuity

McLaren provided design solutions to numerous challenges during the project. Working closely with the geotechnical engineering company on the project, McLaren discovered we were able to utilize shallow spread footings in lieu of costly deep foundations via ground improvement methods. Using Finite Element Analysis (FEA) McLaren designed shearwall core mat foundations to eliminate tension rock anchors. A structural steel-framed mezzanine level was designed to hang from the concrete framed floor above, eliminating the need for costly piers and spread footings. To maximizes the space of the building,  eccentric shallow spread foundations were designed adjacent to the property line providing a “zero lot line”, leaving essentially no extra space between the building and the boundary line.

For the parking garage, McLaren worked closely with the precast fabricator to brace the top of the basement foundation level with precast garage floors for the 5-tier parking garage. This eliminated costly cantilever retaining walls, significantly reducing the wall thickness, size of foundations and reinforcement.

For the two-story amenity area totaling 18,000 square feet of interior and exterior amenity space (including the pool), McLaren designed long-span composite roof joists to accommodate an open floor plan and a 14-foot-tall steel-framed roof screen wall. Concrete shearwalls to continue to roof level were also designed to eliminate the need for cold-formed steel flat strap shearwalls that are often cut in the field by other trades, eliminating costly repairs.

Value Engineering

McLaren led an overall Value Engineering review of the building layout and performed a parametric analysis of the column grid and floor layout with the Architect to achieve upwards of a 15% reduction in concrete yardage, slab thicknesses, steel reinforcing bars and shallow footings sizes.

Location
Stamford, CT
Year Completed
2022
Client
Quarterra Multifamily

Image Credit for Image 1: Lessard Design