Arts + Entertainment
Live Performances
Museums + Art Displays
Pop-Ups
Signage
Studios + Sound Stages
TV + Film Production
Theaters
Theme Parks + Playplaces
discover
Education
Colleges + Universities
K-12 Schools
discover
Energy
Solar Energy
Transmission Infrastructure
Wind Energy
Oil + Gas
discover
Government
Municipal
State
Federal
discover
Healthcare
Senior Care
Hospitals
Outpatient Facilities
discover
Industrial
Heavy Industrial
Warehouse + Distribution Centers
Industrial Ports + Terminals
discover
Ports + Coastal
Berths, Piers + Wharves
Bulkheads
Esplanades
Ferry Landings, Ship Terminals
Floating Structures
Ports + Terminals
Marinas + Breakwaters
Transfer Stations
discover
Public Infrastructure
Bikeways + Trails
Garage + Parking Facilities
Park + Recreational Spaces
Streetscapes
Utility Infrastructure
Water + Wastewater
discover
Real Estate Development
Commercial
Community Facilities
Mixed-Use
Multifamily Residential
discover
Transportation
Airports
Bridges
Ports + Terminals
Rail Transportation
Roads + Highways
Ropeway + Linear Infrastructure
discover
Floating Harbor Wetland
Multimodal Processing Plant
416 + 420 Kent Dynamic Highrise
Wittpenn Bridge
One Times Square
LaGuardia Airport Terminal B
NYC Ferry
Orlando Airport LED Displays
A leading full-service engineering firm renowned for our trusted, high quality, and innovative approach to solving complex challenges.
Media Platform

NYC Marathon Structural Engineering
2025

As thousands of runners crossed this year’s NYC Marathon finish line, one structure quietly supported the moment: the Media Bridge above the finish chute. While spectators focused on the athletes, our Entertainment Engineering team ensured the elevated platform remained safe, stable, and ready for race day.

Working with BNW Rigging, we provided structural design and review services for the temporary Media Bridge, which gives broadcasters and photographers the vantage point needed to capture the race’s defining moments.

This year’s installation drew on our team’s experience with temporary event structures, fast-paced site coordination, and on-the-spot design adjustments. Delivering a reliable platform in a crowded, time-sensitive environment requires careful planning, quick problem-solving, and close collaboration with on-site partners.

The Media Bridge is one component of the finish-line infrastructure our engineers support each marathon season, helping document the determination and resilience of every runner crossing the line.

Congratulations to all the participants on an incredible race!

Previous NYC Marathon Structural Engineering Work

We’re excited to share that McLaren Engineering Group is now part of KCI Technologies Inc., a 100% employee-owned firm offering engineering and consulting across all markets, and construction for communications and environmental projects.

Our commitment to excellence continues with the added strength of KCI’s full range of engineering and consulting services.

Visit KCI’s website to learn more.