Blog/Events

Kosciuszko Bridge Removal

Aug. 3, 2017

Last week, McLaren provided naval architecture and navigation services to help transport the old Kosciuszko Bridge to a recycling plant in New Jersey. McLaren assisted in calculating the barge stability and vessel arrangement for the lowering, loading, and lashing of the 300-foot trestle. McLaren also determined the movement of barges carrying the large center span of the bridge through Newtown Creek, with respect to the barge configuration, positioning of the bridge span on the barges, navigational restrictions, USCG restrictions and general feasibility. The video shows the bridge navigating through Newtown Creek.