Solutions From Concept To Completion
Structural Engineering
Site Solutions From Concept To Completion
Civil Engineering
Solutions Where Land Meets Water
Marine + Coastal
Solutions From Procurement To Completion
Construction Engineering
Structural + Mechanical Specialists
Entertainment Engineering
Consultation, Design + Inspection
Facade + Building Envelope
Soil + Foundation
Geotechnical Engineering
Investigation + Litigation Support
Forensic Engineering
Arts + Entertainment
Live Performances
Museums + Art Displays
Pop-Ups
Signage
Studios + Sound Stages
TV + Film Production
Theaters
Theme Parks + Playplaces
discover
Education
Colleges + Universities
Private + Specialty Schools
Public K-12
discover
Energy
Solar Energy
Transmission Infrastructure
Wind Energy
Oil + Gas
discover
Government
Municipal
State
Federal
discover
Healthcare
Senior Care
Hospitals
Outpatient Facilities
discover
Industrial
Heavy Industrial
Warehouse + Distribution Centers
Industrial Ports + Terminals
discover
Ports + Coastal
Berths, Piers + Wharves
Bulkheads
Esplanades
Ferry Landings, Ship Terminals
Floating Structures
Ports + Terminals
Marinas + Breakwaters
Transfer Stations
discover
Public Infrastructure
Bikeways + Trails
Garage + Parking Facilities
Park + Recreational Spaces
Streetscapes
Utility Infrastructure
Water + Wastewater
discover
Real Estate Development
Commercial
Community Facilities
Mixed-Use
Multifamily Residential
discover
Transportation
Airports
Bridges
Ports + Terminals
Rail Transportation
Roads + Highways
Ropeway + Linear Infrastructure
discover
Floating Harbor Wetland
Multimodal Processing Plant
416 + 420 Kent Dynamic Highrise
Wittpenn Bridge
Tiffany Crane
LaGuardia Airport Terminal B
NYC Ferry
Orlando Airport LED Displays
A leading full-service engineering firm renowned for our trusted, high quality, and innovative approach to solving complex challenges.

Large Entertainment Venue – The Hall at Live!

A partially existing post-tensioned concrete parking deck has been transformed into a 3-level, 75,000-square-foot, steel-framed entertainment superstructure dubbed THE HALL at LIVE! In 2018, The Cordish Companies, owners of the LIVE! Casino and Hotel resort in Hanover, Maryland, celebrated the grand opening of their newest 17-story luxury hotel tower and 12,000 square foot ballroom space designed by architects Klai Juba Wald. They soon realized the project’s success presented an opportunity to expand the development with an on-site, large-scale entertainment venue centered on attracting big-name national acts to the casino resort.

At that time, the northwest corner of the LIVE! development featured a post-tensioned concrete parking deck with open-air loading access to the ballroom. The team envisioned modifying the area, which was conveniently sandwiched between the existing event space and casino, into a permanent yet flexible high-end facility that could soon accommodate 4,500+ patrons. 

McLaren Engineering Group, who provided both structural and civil design and engineering services for the entire LIVE! complex since its original construction in 2012, proposed an innovative approach to reusing the parking deck and constructing an entertainment superstructure above it. Doing so would also accommodate a significantly accelerated project delivery schedule, making THE HALL at LIVE! fully operational in under 24 months from beginning of design to grand opening.

McLaren was tasked with reusing the existing parking deck structure and repurposing it into the main event space floor, designing and constructing a brand new three-story event space with tiered seating and first-class back-of-house accommodations, and making use of the existing foundations by any means necessary to minimize disruptions to the site. Right-of-way to the network of access roads servicing the casino development always had to be maintained, including a major 3-lane casino entrance routed directly below the middle of the proposed project. Lastly, the 24-hour casino and hotel operations could not be disrupted, further restricting the location of any new structural work.

With these constraints in mind, steel was selected as the project’s structural material of choice for its superior strength-to-weight ratio, its ability to minimize reinforcement to the existing construction, and aptness to achieve the long spans needed to maximize for a column-free performance space. The majority of the 820 tons of steel used was domestically sourced from warehouse stock and fabricated locally for the project by Kinsley Manufacturing.

Engineering A Large Entertainment Venue

McLaren designed the 75,000 square-foot facility using a strategic combination of composite steel framing for the floor spaces and long-span transfer trusses at the roof to create an economical and lightweight framing system. The facility features a 30,000 square foot main orchestra level offering flexible seating configuration, a 12,000 square foot “loge” mezzanine level with traditional fixed seating boxes, and a 15,000 square foot VIP level with tiered stadium-style seating. Each tier of seating was designed to offer audiences unobstructed, column-free views of the built-in performance stage equipped with advanced sound, lighting, and theatrical rigging systems.  Behind the stage, the grand entrance lobby features an open 3-story atrium and steel-framed monumental stair.

At the onset of the expansion, reinforcement of the existing post-tensioned concrete-framed parking deck was needed to support the proposed superstructure. McLaren devised a foundation system to increase the capacity of the existing spread footings which were originally designed for one level of structured parking, to adaptively accommodate the new three-level steel-framed large entertainment venue.  The existing construction was also stiffened laterally to withstand the wind and seismic forces from the new braced frame system in the superstructure.

A main project goal was making the performance space column-free to eliminate visual obstructions and maximize flexibility. To accomplish this, McLaren devised a steel truss roof system to hang the tiered basin VIP level seating from above.  The trusses clear span the entire 180 foot-wide performance space to create unimpeded views of the stage. As such, supporting columns extending to the roof level were located within the exterior of the structure. Careful to avoid any disruptions or closures to nearby business activity, McLaren teamed with a general contractor and fabricator to limit the truss depths to 12’-6” and accommodate bolted field splices to allow for shop assembly of the truss sections and practical delivery to the project site.  The lavish VIP level expanse also supports a private bar, lounge, and balcony, all exclusively hung by the steel roof trusses above.

The lower “loge” mezzanine tier flanks the stage area on both sides of the performance space.  To accommodate the column-free mandate, the loge level seating employs a clever framing arrangement of cascading cantilevers.  The system works by arranging each successive cantilever and fulcrum bay to be framed off the adjacent cantilevered seating box to form the “saw tooth” geometry envisioned by the Architect. Since deflections accumulate linearly through the cascading system, particular attention was paid during the design process to ensure stringent deflection behavior was tightly controlled.

Considering the known susceptibilities of long-spanning, light-weight structures to motion-induced vibration, McLaren performed a rigorous finite element-based vibration analysis of the seating tiers. The mathematical model-based approach to vibration response directly evaluated the theoretical acceleration response to concert-goer movements (such as dancing and jumping) based on the methodology published by AISC in the recently-updated AISC Design Guide 11, Second Edition.  The analysis ensured the superstructure had adequate stiffness and damping in line with industry-acceptable levels to mitigate any potential patron discomfort. In the end, McLaren’s approach to this analysis permitted reduced truss depths and less steel tonnage in the seating bowl framing compared to vibration mitigation techniques using more common empirical approaches.

Entertainment Insight

McLaren also drew upon extensive experience working with world-class performance venues and theaters around the world to provide design assistance to the state-of-the-art 7,000 square foot flexible theater grid, catwalk, and rigging support system. Concealed within the depth of the roof truss framing above the main stage and extending over the audience, the advanced entertainment set up rivals some of the largest performance venues around the nation.

THE HALL at LIVE! officially opened in December 2019. Construction was completed on-time and without disruption to daily business operations or traffic flow due in part to innovative engineering, thoughtful material selection, and cohesive teamwork. Today, the newly erected large entertainment venue sits as one of the largest performance venues in the state of Maryland and is slated to feature some of the nation’s best touring acts, comedians, championship boxing, and events.

 

Location
Hanover, MD
Year Completed
2019
Client
The Cordish Companies