Solutions From Concept To Completion
Structural Engineering
Site Solutions From Concept To Completion
Civil Engineering
Solutions Where Land Meets Water
Marine + Coastal
Solutions From Procurement To Completion
Construction Engineering
Structural + Mechanical Specialists
Entertainment Engineering
Consultation, Design + Inspection
Facade + Building Envelope
Soil + Foundation
Geotechnical Engineering
Investigation + Litigation Support
Forensic Engineering
Arts + Entertainment
Live Performances
Museums + Art Displays
Pop-Ups
Signage
Studios + Sound Stages
TV + Film Production
Theaters
Theme Parks + Playplaces
discover
Education
Colleges + Universities
Private + Specialty Schools
Public K-12
discover
Energy
Solar Energy
Transmission Infrastructure
Wind Energy
Oil + Gas
discover
Government
Municipal
State
Federal
discover
Healthcare
Senior Care
Hospitals
Outpatient Facilities
discover
Industrial
Heavy Industrial
Warehouse + Distribution Centers
Industrial Ports + Terminals
discover
Ports + Coastal
Berths, Piers + Wharves
Bulkheads
Esplanades
Ferry Landings, Ship Terminals
Floating Structures
Ports + Terminals
Marinas + Breakwaters
Transfer Stations
discover
Public Infrastructure
Bikeways + Trails
Garage + Parking Facilities
Parks + Public Spaces
Recreational Spaces
Streetscapes
Utility Infrastructure
Water + Wastewater
discover
Real Estate Development
Commercial
Community Facilities
Mixed-Use
Multifamily Residential
discover
Transportation
Airports
Bridges
Ports + Terminals
Rail Transportation
Roads + Highways
Ropeway + Linear Infrastructure
discover
Floating Harbor Wetland
Multimodal Processing Plant
416 + 420 Kent Dynamic Highrise
Wittpenn Bridge
Tiffany Crane
LaGuardia Airport Terminal B
NYC Ferry
Orlando Airport LED Displays
A leading full-service engineering firm renowned for our trusted, high quality, and innovative approach to solving complex challenges.

Pulaski Skyway Construction Engineering

The Pulaski Skyway is a 3.5-mile, four-lane steel bridge located in the northeastern part of New Jersey and was originally constructed in the 1930’s. The bridge in Kearny, NJ is part of a major highway system that helps connect New Jersey motorists with New York City. Inspections of the Pulaski Skyway revealed the poor condition of the bridge, highlighting signs of significant deterioration and section loss. It was found that the outdated design and current condition of the bridge made it structurally deficient and functionally obsolete.

Construction Engineering Services

McLaren Engineering Group was hired to provide construction engineering services and developed the means and methods for installing the new precast panels for the northbound lanes of the roadway. Overhead clearances, weight restrictions, and temporarily unbraced members on the bridge made conventional construction methods difficult – but McLaren made the difference by working with the contractor to explore several alternative options for each of the different sections of the skyway. For the river spans, McLaren developed and designed a custom gantry crane, along with a low-profile custom rigging frame. The gantry would pick the new precast panels from a delivery truck, located in a staging area right outside the overhead through-truss span, and then carry the panel out to its final location.

For the more typical spans, McLaren’s construction engineering team developed two primary solutions. The first was a temporary stringer bracing system and timber crane mats as a temporary deck, to allow a hydraulic crawler crane to set panels around the clock, regardless of adjacent lane closures. The second solution was achieved by performing an advanced analysis of the existing bridge to justify the structure for placing a hydraulic crawler on the lanes adjacent to the work zone. This solution could only be implemented during temporary full bridge closures, on nights and weekends, but yielded extremely high productivity.

Location
Kearny, NJ
Year Completed
2017
Submarkets
Client
CCA CIVIL, Inc.; Owner: New Jersey Department of Transportation