Solutions From Concept To Completion
Structural Engineering
Site Solutions From Concept To Completion
Civil Engineering
Solutions Where Land Meets Water
Marine + Coastal
Solutions From Procurement To Completion
Construction Engineering
Structural + Mechanical Specialists
Entertainment Engineering
Consultation, Design + Inspection
Facade + Building Envelope
Soil + Foundation
Geotechnical Engineering
Investigation + Litigation Support
Forensic Engineering
Live Performances
Museums + Art Displays
Pop-Ups
Signage
Studios + Sound Stages
TV + Film Production
Theaters
Theme Parks + Playplaces
Education
Colleges + Universities
Private + Specialty Schools
Public K-12
Energy
Solar Energy
Transmission Infrastructure
Wind Energy
Oil + Gas
Municipal
State
Federal
Senior Care
Hospitals
Outpatient Facilities
Heavy Industrial
Warehouse + Distribution Centers
Industrial Ports + Terminals
Berths, Piers + Wharves
Bulkheads
Ferry Landings, Ship Terminals
Floating Structures
Ports + Terminals
Marinas + Breakwaters
Transfer Stations
Bikeways + Trails
Esplanades
Garage + Parking Facilities
Parks + Public Spaces
Recreational Spaces
Streetscapes
Utility Infrastructure
Commercial
Community Facilities
Mixed-Use
Multifamily Residential
Airports
Bridges
Ports + Terminals
Rail Transportation
Roads + Highways
Ropeway + Linear Infrastructure
Floating Harbor Wetland
Albany Warehouse Drone Inspection + 3D Digital Twin Modeling
416 + 420 Kent Dynamic Highrise
Wittpenn Bridge
Tiffany Crane
Orlando Airport LED Displays
NYC Ferry
TSX Broadway
Multimodal Processing Plant
Grassy Point Road Bridge Replacement
LaGuardia Airport Terminal B
A leading full-service engineering firm renowned for our trusted, high quality, and innovative approach to solving complex challenges.

Marina Resiliency for FDNY

McLaren completed a Capital Project Scope Development (CPSD) study for two New York Fire Department (FDNY) marinas. Underwater inspections were performed to determine stability, anticipated life-span and restoration recommendations. Our marine engineering team then conceptualized alternative designs for piers, docks, fender systems and wave attenuators for each facility. The new wave screen design minimizes maintenance, improves performance and provides sufficient marina resiliency allowing for critical emergency operations during a disaster event.



Posted on: Jul. 23, 2019