|
|
Solutions From Concept To Completion
Structural Engineering
Site Solutions From Concept To Completion
Civil Engineering
Solutions Where Land Meets Water
Marine + Coastal
Solutions From Procurement To Completion
Construction Engineering
Structural + Mechanical Specialists
Entertainment Engineering
Consultation, Design + Inspection
Facade + Building Envelope
Soil + Foundation
Geotechnical Engineering
Investigation + Litigation Support
Forensic Engineering
Arts + Entertainment
Live Performances
Museums + Art Displays
Pop-Ups
Signage
Studios + Sound Stages
TV + Film Production
Theaters
Theme Parks + Playplaces
discover
Education
Colleges + Universities
Private + Specialty Schools
Public K-12
discover
Energy
Solar Energy
Transmission Infrastructure
Wind Energy
Oil + Gas
discover
Government
Municipal
State
Federal
discover
Healthcare
Senior Care
Hospitals
Outpatient Facilities
discover
Industrial
Heavy Industrial
Warehouse + Distribution Centers
Industrial Ports + Terminals
discover
Ports + Coastal
Berths, Piers + Wharves
Bulkheads
Esplanades
Ferry Landings, Ship Terminals
Floating Structures
Ports + Terminals
Marinas + Breakwaters
Transfer Stations
discover
Public Infrastructure
Bikeways + Trails
Garage + Parking Facilities
Parks + Public Spaces
Recreational Spaces
Streetscapes
Utility Infrastructure
Water + Wastewater
discover
Real Estate Development
Commercial
Community Facilities
Mixed-Use
Multifamily Residential
discover
Transportation
Airports
Bridges
Ports + Terminals
Rail Transportation
Roads + Highways
Ropeway + Linear Infrastructure
discover
Floating Harbor Wetland
Multimodal Processing Plant
416 + 420 Kent Dynamic Highrise
Wittpenn Bridge
Tiffany Crane
LaGuardia Airport Terminal B
NYC Ferry
Orlando Airport LED Displays
A leading full-service engineering firm renowned for our trusted, high quality, and innovative approach to solving complex challenges.

Belvedere Castle Geothermal Renovations

Belvedere Castle in Central Park underwent a 15-month restoration, reopening in 2019 to provide visitors with some of the best views in Manhattan. Designed by Frederick Law Olmsted and Calvert Vaux in 1867–1869, the schist and granite structure was long troubled by water leakage issues. Poor drainage and waterproofing led to damage that worsened over time and caused the Central Park Conservancy to invest in waterproofing and internal drainage repair.

Geothermal

After considering many options to solve for effective heating and cooling, a sustainable closed-loop geothermal system was decided upon and made possible by the Castle’s position atop Vista Rock.

The underground system was developed by drilling rigs which bored three 400-foot holes to house a piping system that uses the temperature of the earth (a consistent 50-60 degrees at that depth) to moderate the temperature of Belvedere Castle above. The geothermal loop system works as cool water travels down into the earth where it’s warmed and pumped back up to the building, on repeat, depending on the season. Inside the Castle, a heat exchanger transfers the heat into the building’s air system—heating or cooling each room. McLaren provided various engineering services the renovation possible by addressing drainage, waterproofing and climate control systems.

Geotechnical Engineering for Geothermal

Our geotechnical engineering team developed a boring plan and specifications for exploratory work which was used by the drilling contractor on the site. They conducted a review of Contractor’s detailed shop and installation drawings for approval with respect to the proposed geothermal wells, piping and trenching. McLaren then supervised the borings in the field investigation, the geothermal well installation, prepared field reports, and coordinated obtaining the boring logs, field and test results, and all laboratory testing results.

Site/Civil Engineering for Pathways + Utilities

Site plan approval documents and designs were prepared by our site/civil engineering team for an ADA compliant pedestrian pathway on the site. These documents included existing conditions of the site, proposed plans for grading and utilities, stormwater management drawing, sanitary sewer and report, as well as construction details. During this phase of the project, it was determined that a sanitary sewer discharge line was damaged and must be replaced.

McLaren engineered the utility improvements and helped make this building one of NYC’s geothermal public facilities. The team also provided civil engineering services for the design of an accessible route through the steep terrain to make this landmark accessible for all.

Pedestrian Bridge Engineering

McLaren designed and developed new pedestrian bridges in the area and inspected various existing walls on site to determine if additional support was required.

Award Winner
Location
Central Park, New York, NY
Year Completed
2019
Client
Central Park Conservancy