East Avenue Bridge Design

East Ave Bridge.jpg
Project Overview: 
The East Avenue Bridge is a single-span bridge supporting four main line railroad tracks, contiguous to the East Norwalk Train Station.
McLaren's Role: 
As Prime Consultant, McLaren was responsible for complete reconstruction design of the bridge including the replacement of the superstructure and replacement of the existing abutments for roadway widening. McLaren provided a preliminary engineering study of four (4) span/roadway width scenarios to minimize the depth of the structure in order to improve the vertical clearance beneath the bridge.
Service: 
Total Bridge Design
Service: 
Innovative Leak-Resistant Superstructure Design
Location: 
Norwalk, Connecticut
Client: 
Connecticut Department of Transportation
Project Type: 
Bridge Reconstruction
Role: 
Prime
Contract Period: 
1997-2013
Construction Cost: 
10,000,000 (Est.)
Image: 
East Ave Bridge.jpg

Location
Norwalk, Connecticut

Client
Connecticut Department of Transportation

Our Role
Prime
Project Type
Bridge Reconstruction

Contract Period
1997-2013

Construction Cost
10,000,000 (Est.)
Services
Total Bridge Design
Innovative Leak-Resistant Superstructure Design