N-Sync No Strings Tour Stage
August 12, 2008 - 1:19pm — mmase
Project Overview:
McLaren provided structural engineering review and analysis services for the portable mechanized stage platform used during the summer tour for ‘N Sync. The show featured a 10-foot x 18-foot mobile, elevated stage, designed to present the five lead performers of the group on a translucent platform, approximately 10-feet above the heads of the audience.
Service:
Structural Engineering
Service:
Mechanical Engineering
Service:
Structural Analysis
Location:
United States and Canada
Client:
Skeez, LLC
Project Type:
Structural and Mechanical Design
Role:
Prime
Contract Period:
2000
Construction Cost:
3,000,000
Image:
65a - NSync stage.jpg
Image:
65b - NSync stage (2).jpg
Location
United States and Canada
Client
Skeez, LLC
Our Role
Prime
United States and Canada
Client
Skeez, LLC
Our Role
Prime
Project Type
Structural and Mechanical Design
Contract Period
2000
Construction Cost
3,000,000
Structural and Mechanical Design
Contract Period
2000
Construction Cost
3,000,000
Services
Structural Engineering
Mechanical Engineering
Structural Analysis
Structural Engineering
Mechanical Engineering
Structural Analysis

