Project Overview: 
McLaren was retained by Metro-North Railroad to provide engineering services associated with the timber tie replacement of the following three bridges: Bridge NH14.37 over Columbus Avenue in Mount Vernon, NY; Bridge NH15.06 over Fifth Avenue in Pelham, NY; and Bridge HA29.52 over Davis Brook in Thornwood, NY. The objective of the project was to ensure the structural integrity and safety of open deck bridge timbers on each of the bridges. The approximate number of bridge timbers replaced was 374.
McLaren's Role: 
In order to ensure the proper fit of the replacement bridge timbers, McLaren performed a field survey and measurements at each bridge site, developed existing and proposed rail profiles, and developed spacing diagrams, dapping diagrams, and packaging diagrams.
Service: 
Bridge Design
Service: 
Surveying
Service: 
Track Design
Service: 
Timber Dapping Design
Location: 
Westchester County, New York
Client: 
Metro-North Railroad
Project Type: 
Bridge Design
Role: 
Prime
Contract Period: 
2006
Construction Cost: 
N/A
Image: 
7b MNR HA15.06(2).jpg
Image: 
7b MNR HA15.06.jpg
Image: 
7c MNR HA14.57(2).jpg
Image: 
7c MNR HA 14.57.jpg

Location
Westchester County, New York

Client
Metro-North Railroad

Our Role
Prime
Project Type
Bridge Design

Contract Period
2006

Construction Cost
N/A
Services
Bridge Design
Surveying
Track Design
Timber Dapping Design