Central Nyack Storm Drainage Improvement

Central Nyack Storm Drain Improvements
Project Overview: 
The Town of Clarkstown needed a cost efficient design solution to address problems with both surface and subsurface drainage due to insufficient / improperly placed inlets and inadequate channel /culvert capacity. Numerous streets and adjacent lots required the improvements to alleviate street and local flooding conditions that were plaguing the neighborhood.
McLaren's Role: 
McLaren provided engineering and design services to assist in the remediation of these problems, including site investigation, drainage analysis and design, environmental assessment, utility coordination, survey coordination, public outreach, and construction administration. Design challenges included design solutions that minimized the disturbance and disruption to private residences and a stringent design schedule.
Service: 
Site/Civil Engineering
Service: 
Drainage Analysis
Service: 
Site/Civil EngineeringDrainage Analysis Drainage Design
Location: 
Central Nyack, New York
Client: 
Town of Clarkstown, Department of Environmental Control
Project Type: 
Stormwater Management
Role: 
Prime
Contract Period: 
2005-2006
Construction Cost: 
3,000,000
Image: 
25a - Central Nyack Storm Drain.jpg

Location
Central Nyack, New York

Client
Town of Clarkstown, Department of Environmental Control

Our Role
Prime
Project Type
Stormwater Management

Contract Period
2005-2006

Construction Cost
3,000,000
Services
Site/Civil Engineering
Drainage Analysis