4th and 5th Street Piers at Kent

45 - 4th Street Pier.jpg
Project Overview: 
For this redevelopment project along Williamsburg’s waterfront in Brooklyn, New York, McLaren performed an investigation of the waterfront structures including existing pile fields and bulkheads, and performed a hydrographic survey of the project site area.
McLaren's Role: 
McLaren provided a boring plan, waterfront site investigation and permitting services, and conceptual designs in addition to supervising the taking of geotechnical boring samplings. The Piers are being revitalized in two phases: the demolition phase and the construction phase. McLaren is performing detail design, construction inspection and construction administration services during these phases. The demolition phase consisted of demolition, removal, and disposal of remnants of the existing piers and bulkheads. This was followed by the construction phase, which is consisting of constructing new steel pile bulkheads, platforms, and pier structures, as well as the installation of railings, electric supply, and lighting of the deck of the platforms and piers.
Service: 
Underwater Investigation
Service: 
Marine Engineering Design
Service: 
Geotechnical Engineering
Service: 
Permitting
Service: 
Bid Document Preparation
Service: 
Construction Administration
Location: 
Brooklyn, New York
Client: 
RD Management Corp.
Project Type: 
Marine Structures
Role: 
Prime
Contract Period: 
2004-2010
Construction Cost: 
N/A
Image: 
45a - 4th Street Pier (2).jpg
Image: 
45b - 4th St. Pier (construction).jpg
Image: 
45c - 4th St. Pier (construction).jpg

Location
Brooklyn, New York

Client
RD Management Corp.

Our Role
Prime
Project Type
Marine Structures

Contract Period
2004-2010

Construction Cost
N/A
Services
Underwater Investigation
Marine Engineering Design
Geotechnical Engineering
Permitting
Bid Document Preparation
Construction Administration